Gold Elution Process and Electrowinning Plant: AARL, Zadra and Specs

An elution and electrowinning plant strips gold from loaded activated carbon and deposits it onto cathodes as the final step before smelting. Carbon is eluted in a heated pressure vessel with caustic cyanide solution at 110–140 °C, and the resulting pregnant eluate is passed through an electrowinning cell where gold plates onto steel wool or stainless cathodes. Batch sizes for small to medium Tanzanian plants typically run 0.5–10 tonnes of carbon per cycle.

Gold Processing & Recovery·14 min read·Updated 2026-09-15

Soma maelezo ya kifaa hiki kwa Kiswahili →

An elution and electrowinning plant removes gold from loaded carbon and recovers it from solution onto electrodes.
An elution and electrowinning plant removes gold from loaded carbon and recovers it from solution onto electrodes.

The Gold Elution Process, Step by Step

Elution is the reverse of adsorption. In the leach tanks, activated carbon picks up gold from cyanide solution at ambient temperature. In the elution column, heat, caustic soda and cyanide push the gold back off the carbon into a small volume of rich solution. Electrowinning then takes the gold out of that solution as a solid.

Gold elution process flow Loaded carbon moves through acid wash, elution, electrowinning and carbon regeneration. Gold sludge from the electrowinning cell goes to smelting to make doré, and regenerated carbon returns to the leach tanks. 1. Loaded carbonscreened from CIL/CIP 2. Acid washdilute HCl, then rinse 3. Elution (strip)hot caustic cyanide 4. Electrowinninggold plates on cathodes 5. Smeltingsludge + flux → doré 6. Regeneration kilnstripped carbon, 650–750 °C stripped (barren) carbon back to leach tanks
Scroll the diagram sideways to read all the labels.Batch elution circuit. Pregnant eluate from step 3 feeds the electrowinning cell; in a Zadra circuit it circulates continuously between the column and the cell.
  1. Recover and wash the loaded carbon. Carbon is pumped from the first CIL or CIP tank, screened from the slurry and washed with water so ore fines do not enter the column.
  2. Acid wash. Dilute hydrochloric acid, typically around 3%, dissolves calcium carbonate and other scale that blocks carbon pores and slows the strip. The carbon is then rinsed and neutralised. Acid washing is essential in AARL and strongly recommended in Zadra.
  3. Elution (the strip). Hot caustic cyanide solution passes through the carbon bed at 110–140 °C in a pressure column, or around 95 °C in an atmospheric one. Higher temperature strips faster. The target is below 100 g/t gold left on the carbon.
  4. Electrowinning. The gold-bearing (pregnant) eluate flows through a cell where a rectifier drives current between anodes and cathodes. Gold plates onto steel wool or stainless mesh cathodes.
  5. Smelting. Cathode sludge is filtered, dried and smelted with fluxes into doré bars, which are sold and refined off site.
  6. Carbon regeneration. Stripped carbon is heated in a kiln at roughly 650–750 °C in a steam atmosphere to burn off organic fouling and restore its activity, then returned to the leach tanks.

AARL vs Zadra Elution

The two methods use the same chemistry but run the strip differently. Zadra circulates one eluant continuously through the column and the electrowinning cell. AARL (developed by Anglo American Research Laboratories) soaks the carbon, then displaces the gold with clean hot water in a single pass, producing a smaller, richer eluate.

AARL vs Zadra: typical operating differences
ZadraAARL
How the strip runsContinuous recirculation of eluant between column and electrowinning cellAcid wash, caustic cyanide pre-soak, then elution with hot clean water in one pass
EluantAbout 1% NaOH with 0.1–0.2% NaCNPre-soak about 2–3% NaOH with 1–3% NaCN; elution with softened or demineralised water
Temperature and pressureAbout 95 °C atmospheric, or 125–140 °C pressurised110–120 °C, pressurised
Cycle time48–72 h atmospheric; 12–24 h pressurised8–14 h
EluateLarger volume, lower grade, electrowon in circuitSmaller volume, higher grade, electrowon after the strip
Water qualityTolerant of site waterNeeds good-quality water; hardness fouls the carbon
EquipmentFewer tanks, simpler controlsAcid wash, pre-soak and eluate tanks; more valves and sequencing
Best fitSmall and medium plants, toll elution, 0.5–3 t carbon per batchLarger plants where short cycles and throughput matter

For most small-scale and mid-tier operations in Tanzania, pressure Zadra is the practical middle ground: a much shorter cycle than atmospheric Zadra without the extra tanks and water treatment AARL needs. The trade-offs are covered in more depth in CIL vs CIP vs heap leach and the small CIP and CIL plant guide.

What a Complete Elution Plant Includes

Quotes differ most in what they leave out. A working plant, not just a column, includes:

Elution plant scope checklist
ComponentWhat it does
Elution columnInsulated stainless vessel holding the carbon batch, pressure rated and certified for pressure methods
Elution heater or boilerDiesel-fired or electric heating with a heat exchanger to hold the eluant at strip temperature
Acid wash vesselRemoves scale before stripping; often the column itself in small plants
Solution tanks and pumpsEluant make-up, circulation, pre-soak (AARL) and barren solution
Electrowinning cell and rectifierPlates gold from the eluate onto cathodes
Carbon regeneration kilnRestores carbon activity so it keeps loading gold
Smelting furnaceTurns cathode sludge into doré, with fluxes, crucibles and moulds
Controls and safetyTemperature and pressure control, HCN gas detection, ventilation, eyewash and shower, secure access
Looking for prices? Indicative price bands by batch size, running costs and the case for toll elution are in Gold Elution Plant Price in Tanzania.

Sizing the Carbon Batch to Your Plant

Batch size comes from how much gold your leach circuit recovers and how heavily the carbon is loaded before it is stripped:

Carbon to strip per day (t) = gold recovered per day (g) ÷ (loaded carbon grade − stripped carbon grade) (g/t)

The table below works this through for a free-milling ore at 3 g/t, 90% leach recovery, carbon loaded to 1,500 g/t and stripped to 100 g/t, with a strip every three days. Change any of those and the batch changes in proportion. Higher grade or leaner loading means more carbon.

Worked example: batch size by plant throughput
Plant throughputCarbon to strip per dayBatch every 3 days
50 t/day≈ 0.1 t≈ 0.3 t (consider toll elution)
100 t/day≈ 0.2 t≈ 0.6 t
250 t/day≈ 0.5 t≈ 1.5 t
500 t/day≈ 1.0 t≈ 2.9 t
1,000 t/day≈ 1.9 t≈ 5.8 t

Size the column with a margin above the calculated batch for grade spikes, and check that the regeneration kiln can process the same tonnage between strips. A batch below about half a tonne usually makes vat leach and small CIP operators better off sharing or tolling a plant than owning one.

Power and Heating on Tanzanian Sites

Elution equipment is specified for the Tanzanian supply standard of 400 V three phase at 50 Hz (230 V single phase for controls). Heating is the largest energy load, holding the eluant at strip temperature for the whole cycle.

  • Diesel-fired heating is the usual choice off grid. It is cheaper to run than electric heating on a generator, which converts diesel to electricity and back to heat with large losses.
  • Electric heating makes sense on a reliable TANESCO grid connection, where it is cleaner and easier to control.
  • Generator sizing must cover the circulation pumps, rectifier, kiln burner blowers, lighting, ventilation fans and gas detection together, with starting margin for pump motors. See diesel generators for mining and powering an off-grid mine site.
  • Ventilation and gas detection run whenever cyanide solution is hot. They belong on a protected supply, not the first circuit shed when a generator is overloaded.

Reagent supply for the strip (caustic soda, sodium cyanide, hydrochloric acid and make-up carbon) is covered in activated carbon and sodium cyanide supply in Tanzania.

Elution & Electrowinning Plant Specifications

The figures below describe typical industry specifications for this class of equipment rather than a single fixed model. Use them to scope a requirement, then confirm exact figures against the supplied unit before purchase.

Typical specification range for the Elution & Electrowinning Plant
SpecificationTypical value
Carbon batch size0.5–10 t per cycle
Elution methodsZadra (atmospheric or pressure) and AARL
Operating temperature110–140 °C
Operating pressure150–350 kPa for pressure Zadra
Eluant1–2% NaOH with 0.1–2% NaCN, per method
Cycle time8–14 h AARL; 12–24 h pressure Zadra; 48–72 h atmospheric Zadra
HeatingDiesel or electric boiler with heat exchanger
Electrowinning cathodesSteel wool or stainless mesh
Cell current density10–40 A/m² typical
Gold in barren carbonTarget below 100 g/t after strip
Vessel constructionStainless steel, insulated and pressure rated
AncillariesAcid wash, carbon regeneration kiln, rectifier

Elution & Electrowinning Plant: Uses and Applications

  • CIL and CIP plant gold recovery
  • Heap leach carbon column stripping
  • Toll elution for small operators sharing a facility
  • Carbon regeneration and reactivation circuits

Maintenance Schedule

Most premature failures in this equipment class trace back to a missed routine check rather than a design fault. The intervals below are a practical starting schedule; adjust them to your duty cycle and the manufacturer manual.

Recommended maintenance intervals
IntervalTask
Every cycleCheck vessel pressure relief and temperature control; sample barren carbon to confirm strip efficiency.
WeeklyInspect cathodes and harvest gold sludge; check rectifier output and cell busbar connections.
MonthlyDescale heat exchanger; inspect pump seals and pipework for cyanide leaks; test gas detection in the area.
QuarterlyPressure vessel inspection; recalibrate temperature and pressure instrumentation.
AnnuallyStatutory pressure vessel certification; full electrical inspection of the rectifier and cell.

Frequently Asked Questions

What is the difference between Zadra and AARL elution?

Zadra circulates hot caustic cyanide continuously through the carbon and directly through the electrowinning cell, making it simpler but slower. AARL uses a separate acid wash then a soak-and-displace sequence with clean water, producing a smaller volume of much higher-grade eluate in a shorter cycle. AARL suits higher throughput; Zadra suits simpler, smaller plants.

How long does an elution cycle take?

8–24 hours. Pressure Zadra typically runs 12–24 h, AARL commonly 8–14 h. Cycle time is set by carbon loading, temperature and eluant flow. Running colder to save fuel lengthens the cycle and usually costs more than it saves.

What safety controls does an elution plant need?

Cyanide handling procedures, HCN gas detection with alarms, forced ventilation, emergency eyewash and shower, pressure vessel certification, and controlled access. Elution combines cyanide, caustic, heat and pressure in one place, so it is the highest-hazard area in a typical gold plant.

How is gold recovered from the cathodes?

Steel wool cathodes are acid-digested or directly smelted with fluxes; stainless mesh cathodes are pressure-washed to release a gold sludge which is filtered, dried and smelted. The result is doré bullion, which is then refined further off-site.

Supply and Delivery Across Tanzania

Bart Mining supplies elution & electrowinning plant and related equipment to mining operations throughout Tanzania, with primary coverage of the Lake Victoria Goldfields (Mwanza, Kahama, Geita, Shinyanga and Bukombe), alongside the Lupa Goldfields around Chunya and Mbeya, and delivery nationwide from Dar es Salaam.

MwanzaKahamaGeitaShinyangaBukombeNyangʼhwaleTaboraDodomaArushaMbeyaChunyaSongweDar es SalaamMorogoroMtwaraKigoma

Commonly supplied to: Chunya, Mpanda.

Specification note. The values on this page are industry-standard ranges for the equipment category, published so buyers can scope requirements before enquiring. They are not a quotation and do not describe a specific stocked model. Contact us with your duty, site conditions and power supply for a specification and quotation against your actual requirement.

Manufacturer or supplier of this equipment? Bart Mining sells machinery like the elution & electrowinning plant to buyers across Tanzania through its local market partnership.

Safety and scope references: Cyanide Code scope